The European Commission passed the Gigabit Infrastructure Act (GIA) in May 2024, replacing the Broadband cost-reducing directive (BRCD) passed in 2014. It set a bold vision for ultra-fast connectivity and comprehensive 5G coverage across Europe by 2030. This transformative legislation aims to bridge the digital divide, boost economic growth, and enhance the quality of life for millions of Europeans.

GIA at a glance

The Gigabit Infrastructure Act aims to facilitate and stimulate the provision of Very High-Capacity Networks (VHCN), e.g., fibre networks. It will be achieved through several key measures:

  • Shared use of infrastructure – Encouraging the shared use of ducts and poles for deploying very high-capacity networks (VHCN) to optimise resources and reduce costs.
  • Co-deployment and Coordination of Civil Works – enabling telecom operators to collaborate with public works projects to install fibre optic cables simultaneously, reducing disruptions and expediting broadband expansion.
  • Streamlining Administrative Procedures: Simplifying administrative procedures related to network rollout throughout the EU to reduce bureaucratic hurdles and improve efficiency.
  • Equipping Buildings with High-speed Ready Infrastructure: Encouraging the provision of buildings with high-speed ready infrastructure and ensuring access to it to facilitate broadband deployment and adoption.

By encouraging the joint use of existing physical infrastructure and facilitating the efficient deployment of new infrastructure, the Gigabit Infrastructure Act (GIA) ensures faster and more cost-effective network rollouts.

The GIA presents a unique opportunity to bridge the digital divide and propel Europe towards a more connected future. Novegen is committed to being your trusted partner in achieving this vision.

Book a consultation with Novegen and take a step towards connected Europe.

Book a consultation

GIA Compliance